CCL Controller: Subtask wait interval expired during error handling. Controller is shutting down.
The Controller task of the PowerExchange Logger for Linux, UNIX, and Windows waited longer than the wait interval of one minute for a subtask to respond during error handing.
The PowerExchange Logger shuts down.
To diagnose the event failure that invoked error handing, review the relevant messages in the PowerExchange log file.