job that has been previously deployed and is in a state other than Undeployed from the
My Jobs
page in the
Mass Ingestion
service or from the
All Jobs
tab on the
Mass Ingestion
page in
Operational Insights
or
Monitor
.
Navigate to the row for the job that you want to run.
In the Actions menu for the row, click
Run
.
A subtask is started for each source table.
If the initial load portion of a combined initial and incremental load job fails to load data from a source table to a target table, the
database ingestion
job retries the subtask for the table up to three times. The interval between retries is a minimum of 60 seconds. If all of the initial load retries fail, the subtask acquires the state of
Error
and the table is excluded from replication. The job then tries to proceed with incremental loading. In this case, the job status changes to
Running with Warning
.
If an initial load job detects inconsistencies between column definitions in the source and target tables, the job drops the target table and then re-creates it to be consistent with the source table, prior to loading source data to the target.
For initial load and combined tasks, the initial load might take a long time to perform if the source tables contain many rows.